[1]杨翠华,宁辉,韩艳冬.降低管道工程项目采购成本的有效途径[J].焊管,2010,33(8):52-55.[doi:1001-3938(2010)08-0052-04]
 YANG Cui-hua,NING Hui,HAN Yan-dong.Effective Way to Reduce the Procurement Costs of Pipeline Project[J].,2010,33(8):52-55.[doi:1001-3938(2010)08-0052-04]
点击复制

降低管道工程项目采购成本的有效途径
分享到:

《焊管》[ISSN:1001-3938/CN:61-1160/TE]

卷:
33
期数:
2010年第8期
页码:
52-55
栏目:
经验交流
出版日期:
2010-08-28

文章信息/Info

Title:
Effective Way to Reduce the Procurement Costs of Pipeline Project
文章编号:
1001-3938(2010)08-0052-04
作者:
杨翠华宁辉韩艳冬
(中国石油管道物资装备总公司,河北 廊坊 065000)
Author(s):
YANG Cui-huaNING HuiHAN Yan-dong
(China Petroleum Pipeline Equipments Corporation,Langfang 065000,Hebei,China)
关键词:
采购成本标准化设计集中采购战略联盟
Keywords:
procurement costsstandardization designcentralized purchasingstrategic alliances
分类号:
TE89
DOI:
1001-3938(2010)08-0052-04
文献标志码:
B
摘要:
分析了目前国内管道工程项目采购成本的控制现状,从工程的设计方、施工方、采购方和供货方四个方面分析了影响采购成本的主要因素。同时提出降低采购成本的有效途径,即对内实现采办、物流队伍的专业化,保证采办与业主、设计和施工之间有效沟通,主动解决设计变更和施工变更对采办工作的影响,倡导标准化设计和标准化采购,推行集中采购和招标采购,充分盘活库存剩余物资,合理设置中转站和优化物流配送。对外与供货商建立战略联盟,实现规模生产,分享规模效益。
Abstract:
This article introduced current status of procurement costs of pipeline project,analyzed main effect factors on procurement costs from 4 aspects,such as project designer,construction party,purchaser and supplier.At the same time,it put forward several effective ways to reduce procurement costs,from the internal enterprises,it should realize the specialization of procurement and logistics team,ensure effective communication between the purchaser and the owner,as well as the designer and construction party.,push centralized purchasing and tendering,fully activate surplus materials,reasonably set transshipment station and optimize logistics.For the outside enterprises,it should build strategic alliances with suppliers to realize scale production and share scale benefit.

参考文献/References:

[1]李竞,李红臣.长输管道数据采集系统的成本优化模型[J].中国安全生产科学技术,2007,3(5):59-63.
[2]王建坤.管道企业的计划管理与成本控制[J].国外油田工程,2003,19(6):41-42.
[3]吴益泉.石油管道施工项目成本控制策略[J].大众科技,2005,10(12):90-91.
[4]白志鸿,吴春莉.管道施工企业的成本管理[J].石油工程建设,2006,32(5):67-68.
[5]苏志娟,陈辉.浅谈加强国际管道工程物资采购管理降低采购成本的几点认识[J].今日科苑,2008,10(12):92-93.
[6]王晓香.超高强度管线钢管研究开发的新进展[J].焊管,2010,33(2):5-12.

备注/Memo

备注/Memo:
作者简介:杨翠华(1976-),毕业于西南石油学院经济管理系管理工程专业,主要从事经营管理和合同管理工作。
收稿日期:2009-12-23