[1]郑家胜,于 磊,彭 静,等.去应力退火对X80焊管残余应力影响分析[J].焊管,2019,42(1):24-31.[doi:10.19291/j.cnki.1001-3938.2019.1.004]
 ZHENG Jiasheng,YU Lei,PENG Jing,et al.Effect of Stress Relief Annealing on Residual Stress of X80 Welded Pipe[J].,2019,42(1):24-31.[doi:10.19291/j.cnki.1001-3938.2019.1.004]
点击复制

去应力退火对X80焊管残余应力影响分析()
分享到:

《焊管》[ISSN:1001-3938/CN:61-1160/TE]

卷:
42
期数:
2019年第1期
页码:
24-31
栏目:
试验与研究
出版日期:
2019-01-28

文章信息/Info

Title:
Effect of Stress Relief Annealing on Residual Stress of X80 Welded Pipe
文章编号:
10.19291/j.cnki.1001-3938.2019.1.004
作者:
郑家胜1于 磊1彭 静2邹文超1李 朋1
1. 安徽省特种设备检测院,合肥 230051;
2. 合肥紫金钢管股份有限公司,合肥 230051
Author(s):
ZHENG Jiasheng1 YU Lei1 PENG Jing2 ZOU Wenchao1 LI Peng1
1. Anhui Special Equipment Inspection Institute, Hefei 230051, China;
2. Hefei Ziking Steel Pipe Co., Ltd., Hefei 230051, China
关键词:
焊管直缝埋弧焊管X80残余应力去应力退火ABAQUS
Keywords:
welded pipe straight seam submerged arc welded pipe X80 residual stress stress relief annealing ABAQUS
分类号:
TG162.8
DOI:
10.19291/j.cnki.1001-3938.2019.1.004
文献标志码:
A
摘要:
为了提高焊接质量,降低X80直缝埋弧焊管制造过程中产生的残余应力,采用ABAQUS有限元分析软件对焊管合缝、焊接和去应力退火三个关键工序中产生的应力进行了分析计算。结果显示,合缝过程中,管坯的内、外表面应力分布从焊缝位置到焊缝180°处呈波动式增加,应力值从20 MPa升至550 MPa;焊接完成后,焊缝处和焊缝180°处焊接应力最大,约为350 MPa,从焊缝10°到180°范围内应力逐渐增大,相比较合缝工序,下降了约200 MPa,但残余应力仍然很大;以600 ℃去应力退火为例,退火前后,管坯内、外表面的残余应力下降了约50%。结果表明,去应力退火具有减小和均匀X80厚壁直缝埋弧焊管残余应力的作用,残余应力值随着去应力退火温度的升高而逐渐降低,焊管制造过程中,应兼顾经济效益和综合性能,选用最佳消除残余应力的工艺,提高焊管质量。
Abstract:
In order to improve the welding quality and reduce the residual stress generated during the manufacturing process of X80 longitudinal submerged arc welded pipe,the stress generated in the three key processes of welded pipe joint welding,welding and stress relief annealing was analyzed and calculated by ABAQUS finite element analysis software. The results show that during the jointing process,the stress distribution on the inner and outer surfaces of the pipe increases fluctuating from the weld position to the weld 180°,and the stress value increases from 20 MPa to 550 MPa. After welding,the welding stress at the weld and the weld 180° is the largest,about 350 MPa,and the stress gradually increases from 10° to 180° in the circumferential direction,which is about 200 MPa lower than the molding and stitching process. However,he residual stress is still large. Taking 600 °C stress relief annealing as an example,the residual stress on the inner and outer surfaces of the tube blank decreased by about 50% before and after annealing. The results show that the residual stress of X80 thick-walled submerged arc welded pipe can be reduced and homogenized by stress-relieving annealing,and the residual stress value decreases gradually with the increase of de-stressing annealing temperature. In the manufacturing process of welded pipe,the economic benefit and comprehensive performance should be taken into consideration,and the process of eliminating residual stress should be selected to improve the quality of welded pipe.

参考文献/References:

[1] 庄茁,张帆,岑松,等. ABAQUS非线性有限元分析与实例[M]. 北京:科学出版社,2005.
[2] 马峰.基于ABAQUS平台对铝合金焊接变形和应力的数值模拟及研究[D].重庆:重庆交通大学,2016.
[3] 雷文光,毛小南,卢亚锋,等.钛合金锻件淬火过程温度场及热应力场数值模拟[J].稀有金属材料与工程,2011,40(10):1721-1726.
[4] 程赫明,黄协清,方梦霞,等.具有非线性表面换热系数半圆柱薄壳在快速冷却过程中的热分析[J].应用力学报,2003,20(2):103-106.
[5] 陈重毅,麻永林,邢淑清,等.Monel-400合金板焊后热处理有限元分析[J].电焊机,2012,42(10):48-49.
[6] 李瑞英,赵明,吴春梅.基于SYSWELD的双椭球热源模型参数的确定[J].焊接学报,2014,35(10):93-96.
[7] 廖志谦,刘希林,周川,等.钛合金大厚板窄间隙焊接接头三维应力数值模拟计算[J].中国有色金属学报,2010,20(Z1):393-398.
[8] 李涛,吴运新.7075铝合金厚板淬火残余应力的数值模拟[J].科学技术与工程,2010,10(27):6735-6737.

相似文献/References:

[1]马海君.强力焊管的孔型设计[J].焊管,2007,30(4):56.[doi:1001-3938(2007)04-0056-02]
 MA Hai-jun.Pass Design of High-strength Welded Pipe[J].,2007,30(1):56.[doi:1001-3938(2007)04-0056-02]
[2]李 东,刘庆才.直缝焊管预焊缺陷对埋弧焊质量的影响及控制[J].焊管,2007,30(4):79.[doi:1001-3938(2007)04-0079-04]
 LI Dong,LIU Qing-cai.Affects and Control to Welding Quality of Tack Welding Defect for LSAW Pipe[J].,2007,30(1):79.[doi:1001-3938(2007)04-0079-04]
[3]马建军,黄运明,高建忠,等.大直径厚壁直缝埋弧焊管质量影响因素及控制方法[J].焊管,2007,30(5):19.[doi:1001-3938(2007)05-0019-04]
 MA Jian-jun,HUANG Yun-ming,GAO Jian-zhong,et al.Influence Factors and Control Methods for the Quality of LSAW Line Pipes with Large Diameter and Big Wall Thickness[J].,2007,30(1):19.[doi:1001-3938(2007)05-0019-04]
[4]宫少涛,王爱民,吉玲康,等.X80与X100级管线钢屈服强度Rt 0.5与Rp 0.2的差异性研究[J].焊管,2007,30(5):42.[doi:1001-3938(2007)05-0042-03]
 GONG Shao-tao,WANG Ai-min,JI Ling-kang,et al.Study on Difference Between Yield Strength Rt 0.5 and Rp 0.2 for X80 and X100 Pipelines Steel[J].,2007,30(1):42.[doi:1001-3938(2007)05-0042-03]
[5]刘庆才,李 东,黎剑锋.影响输气管线钢管抗H2S性能主要因素的探讨[J].焊管,2007,30(5):54.[doi:1001-3938(2007)05-0054-05]
 LIU Qing-cai,LI Dong,LI Jian-feng.Key Factors Affecting Sour Service Ability of Welded Pipe and Its Domestic Production[J].,2007,30(1):54.[doi:1001-3938(2007)05-0054-05]
[6]赵春友.中直径直缝双面埋弧焊钢管[J].焊管,2007,30(5):59.[doi:1001-3938(2007)05-0059-02]
 ZHAO Chun-you.Longitudinal Double Submerged Arc Welded Pipe with Medium Diameter[J].,2007,30(1):59.[doi:1001-3938(2007)05-0059-02]
[7]王亚利.钢板预弯边机油缸改型设计[J].焊管,2008,31(1):61.[doi:1001-3938(2008)01-0061-03]
 WANG Ya-li.Modification Design on Hydro Cylinder of Steel Plate Pre-bending Machine[J].,2008,31(1):61.[doi:1001-3938(2008)01-0061-03]
[8]李志华,张 涵,王胜利,等.薄壁直缝埋弧焊管焊缝结晶裂纹分析与控制[J].焊管,2008,31(3):71.[doi:1001-3938(2008)03-0071-02]
 LI Zhi-hua,ZHANG Han,WANG Sheng-li,et al.Analysis and Control of Crystal Crack in LSAW Small Wall-thickness Pipes[J].,2008,31(1):71.[doi:1001-3938(2008)03-0071-02]
[9]郭振其,李志华.热轧卷板开平板在直缝埋弧焊管中的应用[J].焊管,2008,31(4):51.[doi:1001-3938(2008)04-0051-03]
 GUO Zhen-qi,LI Zhi-hua.Plate from Opening and Leveling HRC Applied in Longitudinal Submerged Arc Welded Pipe[J].,2008,31(1):51.[doi:1001-3938(2008)04-0051-03]
[10]彭在美.我国焊接钢管的发展进入重要的战略转折期[J].焊管,2008,31(6):5.[doi:1001-3938(2008)06-0005-10]
 PENG Zai-mei.The Development of China Welded Pipe Steps into the Important Strategic Transition Period[J].,2008,31(1):5.[doi:1001-3938(2008)06-0005-10]
[11]常建伟,乔亚霞.我国输电线路钢管塔用直缝焊管生产现状[J].焊管,2013,36(8):55.[doi:1001-3938(2013)08-0006-55]
 CHANG Jianwei,QIAO Yaxia.Production Status of Longitudinal Welded Pipe Applied into China Power Transmission Line Tower[J].,2013,36(1):55.[doi:1001-3938(2013)08-0006-55]
[12]牛爱军,毕宗岳,牛 辉,等.X70厚壁海底管线钢管研制[J].焊管,2013,36(10):26.[doi:1001-3938(2013)10-0026-05]
 NIU Aijun,BI Zongyue,NIU Hui,et al.Research and Development of X70 Steel Pipe withHeavy Wall Thickness Used in Submarine Pipeline[J].,2013,36(1):26.[doi:1001-3938(2013)10-0026-05]
[13]牛爱军,等.深海管线用高钢级厚壁直缝埋弧焊管研制[J].焊管,2015,38(7):11.[doi:1001-3938(2015)07-0011-06]
 NIU Aijun,BI Zongyue,NIU Hui,et al.Research and Development of High Grade Heavy Wall Thickness Longitudinal Submerged Arc Welded Pipe Used for Deep-sea Pipeline[J].,2015,38(1):11.[doi:1001-3938(2015)07-0011-06]
[14]李 钢,张增全,韩保材,等.直缝埋弧焊管生产线钢板上料装置优选方案[J].焊管,2015,38(9):64.[doi:1001-3938(2015)09-0064-05]
 LI Gang,ZHANG Zengquan,HAN Baocai,et al.The Optimization Program of Steel Plate Feeding Devicefor LASW Pipe Production Line[J].,2015,38(1):64.[doi:1001-3938(2015)09-0064-05]
[15]牛爱军,等.深海用高强厚壁直缝埋弧焊管开发技术难点分析[J].焊管,2015,38(11):15.[doi:1001-3938(2015)11-0015-05]
 NIU Aijun,YIN Lihong,et al.Technical Difficulties Analysis on Development of SAWL Pipe Used for Deep-sea Pipeline with High Strength and Heavy Wall Thickness[J].,2015,38(1):15.[doi:1001-3938(2015)11-0015-05]
[16]李为卫,吉玲康.扩径率对直缝埋弧焊管拉伸性能的影响[J].焊管,2016,39(3):42.[doi:10.19291/j.cnki.1001-3938.2016.03.009]
 LI Weiwei,JI Lingkang.Effect of Expansion Rate on Tensile Performance of Longitudinal Submerged Arc Welded Pipe[J].,2016,39(1):42.[doi:10.19291/j.cnki.1001-3938.2016.03.009]
[17]李 钢,韩保材,张 辉.新型直缝埋弧焊管坡口预热装置[J].焊管,2016,39(9):39.[doi:10.19291/j.cnki.1001-3938.2016.09.009]
 LI Gang,HAN Baocai,ZHANG Hui.A New Type Longitudinal Submerged Arc Welded (SAWL) Pipe Groove Preheating Device[J].,2016,39(1):39.[doi:10.19291/j.cnki.1001-3938.2016.09.009]
[18]刘耀民,谌铁强.X65MS直缝埋弧焊管SSC试验及其影响因素研究[J].焊管,2017,40(1):30.[doi:10.19291/j.cnki.1001-3938.2017.01.006]
 LIU Yaomin,CHEN Tieqiang.Research on SSC Test of X65MS Steel GradeLongitudinal Submerged Arc Welding(SAWL) Pipe and Influence Factors[J].,2017,40(1):30.[doi:10.19291/j.cnki.1001-3938.2017.01.006]
[19]陈小伟,王 旭,郭立萍,等.抗延性断裂X80厚壁直缝埋弧焊管的研发[J].焊管,2018,41(9):6.[doi:10.19291/j.cnki.1001-3938.2018.09.002]
 CHEN Xiaowei,WANG Xu,GUO Liping,et al.Development of X80 Thick-wall Straight Seam Submerged Arc Welded Pipe With Ductile Fracture[J].,2018,41(1):6.[doi:10.19291/j.cnki.1001-3938.2018.09.002]

备注/Memo

备注/Memo:

收稿日期:2018-10-10
修改稿收稿日期:2018-11-27

作者简介:郑家胜(1989—),男,硕士,主要从事压力管道检测工作。

更新日期/Last Update: 2019-02-15