参考文献/References:
[1]全球粗钢产量统计[N].中国冶金报,2008-04-08(1).
[2]杨秀琴.我国钢管工业的现状、问题及发展前景(上)[J].钢管,2008,37(1):12-17.
[3]李晓红.我国焊管生产现状及发展趋势[J].钢管,2008,37(1):18-21.
[4]何德孚.从中外标准对比看不锈钢管制造技术发展[J].管道技术及设备,2007(1):1-6.
[5]何德孚.从欧洲新颁布不锈钢管标准看不锈钢管制造技术发展[J].管道技术及设备,2008(1):1-4,2008(2):1-3.
[6]ASTM A 1016/A1016M-042,Standard Specification for General Requirements for Ferritic Alloy Steel,Austenitic Alloy Steel,and Stainless Steel Tube[S].
[7]EN 13480-3:2002,Metallic Industrial Pipingpart 3,Design and Calculation[S].
[8]ASME B31.1—1985,Power Piping[S].
[9]ASME B31.3—2006,Process Piping[S].
[10]EN 13480-5:2002,Metallic Industrial Pipingpart 5:Inspection and Tests[S].
[11]EN 10266:2003,Steel Tubes,Fittings and Structural Hollow Sectionssymbols and Definitions of Terms for Use in Product Standards[S].
[12]EN ISO 6708:1995,Pipe Work ComponentsDefinition and Selection of DN[S].
[13]ASME B32.5—1977(R1994):Preferred Metric Sizes for Tubular Metal Products Other Than Pipe[S].
[14]ASME B36.10M—2004,Welded and Seamless Wrought Steel Pipe[S].
[15]ASME B36.19M—2004,Stainless Steel Pipe[S].
[16]ENV 10220:1993,Seamless and Welded Steel Tubesdimensions and Masses Per Unite Length[S].
[17]EN ISO 1127:1997,Stainless Steel Tubesdimensions,Tolerances and Conventional Masses Per Unit Length[S].
[18]EN ISO 9626:2002 Stainless Steel Tubing for Manufacture of Medical Devices[S].
[19]BROZDA J.New Generation Austenitic Steel Used in Supercritical Power Industry Plant[J].Welding International,2007,21(7):512 -520.
[20]EN10305-1:2002,Seamless Cold Drawn Tubes[S].
[21]EN10305-2:2002,Welded Cold Drawn Tubes[S].〖ZK)〗
[22]EN10305-3:2002,Welded Cold Sized Tubes[S].
[23]EN10305-4:2003,Seamless Cold Drawn Tubes for Hydraulic and Pneunatic Power Systems[S].
[24]EN10305-5:2003,Seamless Cold Drawn Square and Rectangular Tubes[S].
[25]EN10305-6:2005,Welded Cold Drawn Tubes for Hydraulic and Pneunatic Power Systems[S].
[26]中国国家标准汇编1991—2005[M].北京:中国标准出版社.
相似文献/References:
[1]唐 骏,张亚彬,李 斌,等.焊管车间集中空气净化系统的开发与应用[J].焊管,2008,31(1):45.[doi:1001-3938(2008)01-0045-02]
TANG Jun,ZHANG Kai-bin,LI Bin,et al.Developing & Application of Central Air Purification System of Welded Pipe Mill[J].,2008,31(3):45.[doi:1001-3938(2008)01-0045-02]
[2]孙永喜.长输矿浆管道用焊接钢管[J].焊管,2008,31(4):45.[doi:1001-3938(2008)04-0045-03]
SUN Yong-xi.Long-distance Mineral Slurry Transmitting Pipeline and Welded Pipe[J].,2008,31(3):45.[doi:1001-3938(2008)04-0045-03]
[3]彭在美.我国焊管的市场形势和发展趋向[J].焊管,2009,32(10):5.[doi:1001-3938(2009)10-0005-04]
PENG Zai-mei.China Welded Pipe Current Market Situation and Development Trend[J].,2009,32(3):5.[doi:1001-3938(2009)10-0005-04]
[4]彭在美.从国产连续油管成功研制看我国焊管产品结构调整[J].焊管,2010,33(4):5.[doi:1001-3938(2010)04-0005-05]
PENG Zai-mei.Analyzing Structure Adjustment of China Welded Pipe Product from Successful Trial-production of Domestic Coiled Tubing[J].,2010,33(3):5.[doi:1001-3938(2010)04-0005-05]
[5]王晨,孙志刚,任贵芝,等.手电筒模型在理解超声波探伤基本原理中的应用[J].焊管,2010,33(11):44.[doi:1001-3938(2010)11-0044-03]
[6]崔俊.基于浮动仿形原理的中直径焊接钢管坡口尺寸控制研究[J].焊管,2011,34(2):73.[doi:1001-3938(2011)02-0073-03]
CUI Jun.Research on Dimension Control of the Middle-diameter Welded Pipe Bevels Based on the Principle of Floating Profile Modeling[J].,2011,34(3):73.[doi:1001-3938(2011)02-0073-03]
[7]王晓香.焊接钢管技术的新进展[J].焊管,2011,34(3):5.[doi:1001-3938(2011)03-0005-07]
[8]常少文.焊接钢管超声波自动探伤检测系统的软件设计与应用[J].焊管,2011,34(8):22.
[9]熊庆人,刘白林,吉玲康,等.西气东输二线用管材性能分析数据管理系统的设计与实现[J].焊管,2011,34(8):29.
[10]苏 琦,秦小虎,王少华.焊管静水压试验相关问题的探讨[J].焊管,2015,38(10 ):42.[doi:1001-3938(2015)10-0042-03]
SU Qi,QIN Xiaohu,WANG Shaohua.Discussion on Relevant Problems of Welded Pipe Hydrostatic Test[J].,2015,38(3):42.[doi:1001-3938(2015)10-0042-03]