参考文献/References:
[1]罗建豪.无损残余应力测量技术及其新技术[J].力学与实践,2003,25(4):7-11.
[2]NATHAN W.POERNER B S M E.An Investigation of Variability Among Residual Stress Measurement Techniques and Prediction of Machining Induced Distortion[D].Texas:Texas Tech University,2007:16-17.
[3]KUDRYAVTSEV,KLEIMAN J.Ultrasonic Technique and Device for Residual Stress Measurement[C]∥Proceedings of the SEM Annual Conference on Theoretical.USA:Experimental and Computational Mechanics.Cincinnati,1999:467-473.
[4]RUSSELL D,BUTTLE D,MC CARTHY J.Online Monitoring of Absolute Stress Values in Pipelines[EB/OL].http://www.ppsaonline.com/papers/2006-Aberdeen-5-Russell.pdf,2006-11-22/2009-7-5.
[5]HAYASHI M,ISHIWATA M,MORII Y,et al.Residual Stress Distribution in Carbon Steel Pipe Welded Joint Measured by Neutron Diffraction[J].Mater Sci Res Int,2000,6(4):287-294.
[6]HAN Z W,LIU C,LU W P,et al.Experimental Investigation and Theoretical Analysis of Roll Forming of Electrical Resistance Welded Pipes[J].Journal of Materials Processing Technology,2004,145(3):311-316.
[7]韩志武,刘才.有限条法模拟直缝焊管的成型过程[J].金属学报,2000,36(11):1219-1222.
[8]丁锋,吴东晓.ERW焊管成型变形研究及有限元分析[J].焊管,2007,30(2):23-26.
[9]TENY R W,ROY J P.Approximation of the Axial Strains Developed During the Roll Forming of ERW Pipe[J].Journal of Materials Processing Technology,1990,22(1):29-44.
[10]KIUCH IM,WANG F Z.FEM Simulation of Roll Forming of ERW Pipes and Mill Process Design[C]∥Proceeding of NUM ISHEET’99.Besancon France:[s.n.],1999:529-534.
相似文献/References:
[1]马海君.强力焊管的孔型设计[J].焊管,2007,30(4):56.[doi:1001-3938(2007)04-0056-02]
MA Hai-jun.Pass Design of High-strength Welded Pipe[J].,2007,30(7):56.[doi:1001-3938(2007)04-0056-02]
[2]刘庆才,李 东,黎剑锋.影响输气管线钢管抗H2S性能主要因素的探讨[J].焊管,2007,30(5):54.[doi:1001-3938(2007)05-0054-05]
LIU Qing-cai,LI Dong,LI Jian-feng.Key Factors Affecting Sour Service Ability of Welded Pipe and Its Domestic Production[J].,2007,30(7):54.[doi:1001-3938(2007)05-0054-05]
[3]刘继英,Albert Sedlmaier.异型钢管成型的计算机辅助设计[J].焊管,2008,31(2):53.[doi:1001-3938(2008)02-0053-02]
LIU Ji-ying,Albert Sedlmaier.Computer Aided Design for Rollforming Shaped Tube[J].,2008,31(7):53.[doi:1001-3938(2008)02-0053-02]
[4]侯永利,曹文军.螺旋焊管成型缝“噘嘴”产生的原因及控制措施[J].焊管,2008,31(2):75.[doi:1001-3938(2008)02-0075-02]
HOU Yong-li,CAO Wen-jun.Reason and Control Measure Occurred in Forming Weld? Protruding of Spiral Submerged Arc Welded Pipe[J].,2008,31(7):75.[doi:1001-3938(2008)02-0075-02]
[5]彭在美.我国焊接钢管的发展进入重要的战略转折期[J].焊管,2008,31(6):5.[doi:1001-3938(2008)06-0005-10]
PENG Zai-mei.The Development of China Welded Pipe Steps into the Important Strategic Transition Period[J].,2008,31(7):5.[doi:1001-3938(2008)06-0005-10]
[6]宗 波,王树人,王铁民,等.国产X80级螺旋埋弧焊管的试制[J].焊管,2008,31(6):39.[doi:1001-3938(2008)06-0039〖KG-*2〗-04]
ZONG Bo,WANG Shu-ren,WANG Tie-min,et al.Trial Production of X80 Grade Helically Submerged Arc Welded Pipe in China[J].,2008,31(7):39.[doi:1001-3938(2008)06-0039〖KG-*2〗-04]
[7]张 军.方矩形焊管成型质量分析[J].焊管,2009,32(1):46.[doi:1001-3938(2009)01-0046-02]
ZHANG Jun.Forming Quality Analysis on Rectangular Welded Pipe[J].,2009,32(7):46.[doi:1001-3938(2009)01-0046-02]
[8]马 露 涛.φ720mm焊管平头机夹管装置设计[J].焊管,2009,32(9):47.[doi:1001-3938(2009)09-0047-03]
MA Lu-tao.Design for φ720mm Welded Pipe Beveling Machine Clamp Pipe Device[J].,2009,32(7):47.[doi:1001-3938(2009)09-0047-03]
[9]耿开博.铝管、不锈钢管的高频感应焊接[J].焊管,2009,32(11):29.[doi:1001-3938(2009)11-0029-03]
GENG Kai-bo.High-frequency Induction Welding of Aluminum and Stainless Steel Pipes[J].,2009,32(7):29.[doi:1001-3938(2009)11-0029-03]
[10]陈志翔,Jean Paul Boillot,Jeff Noruk.数字激光视觉技术在焊管生产中的应用[J].焊管,2010,33(2):29.[doi:1001-3938(2010)02-0029-04]
CHEN Zhi-xiang,Jean Paul Boillot,Jeff Noruk.Application of Digital Laser Vision Technology in Welded Pipe Production[J].,2010,33(7):29.[doi:1001-3938(2010)02-0029-04]
[11]孙 宏 编译.具有塑性各向异性的高强度UOE钢管成型与屈曲仿真[J].焊管,2013,36(11):63.[doi:1001-3938(2013)11-0063-08]
Translated by SUN Hong.Forming and Buckling Simulation on High-strength UOE Pipe with Plastic Anisotropy[J].,2013,36(7):63.[doi:1001-3938(2013)11-0063-08]
[12]陈浩明,毕宗岳,等.中碳钢HFW焊管成型焊接质量分析与改进[J].焊管,2019,42(9):56.[doi:10.19291/j.cnki.1001-3938.2019.9.011]
CHEN Haoming,BI Zongyue,LU Yunfei,et al.Quality Analysis and Improvement of Medium Carbon Steel HFW Welded Pipe Forming and Welding[J].,2019,42(7):56.[doi:10.19291/j.cnki.1001-3938.2019.9.011]