相似文献/References:
[1]张振永,郭 彬.腐蚀管道剩余强度的确定及改造措施[J].焊管,2007,30(4):75.[doi:1001-3938(2007)04-0075-04]
ZHANG Zhen-yong,GUO Bin.Determination of Residual Strength for Corrosion Pipeline and Rebuild Measures[J].,2007,30(11):75.[doi:1001-3938(2007)04-0075-04]
[2]徐庆磊,周 巍,尤海英,等.油气管道完整性管理体系分析[J].焊管,2007,30(6):81.[doi:1001-3938(2007)06-0081-04]
XU QING-lei,LIU Ying,YOU Hai-ying,et al.Oil and Gas Pipeline Integrity Management System Analysis[J].,2007,30(11):81.[doi:1001-3938(2007)06-0081-04]
[3]刘 颖,刘长林,周 巍.油气管道的风险评价方法[J].焊管,2008,31(1):36.[doi:1001-3938(2008)01-0036-04]
LIU Ying,LIU Chang-ling,ZHOU Wei.Risk Assessment of Oil-gas Pipeline[J].,2008,31(11):36.[doi:1001-3938(2008)01-0036-04]
[4]李为卫.油气输送管道用大直径双层埋弧焊管[J].焊管,2009,32(3):27.[doi:1001-3938(2009)03-0027-04]
LI Wei-wei.Large Diameter& Double Layer SAW Linepipe for Oil and Gas[J].,2009,32(11):27.[doi:1001-3938(2009)03-0027-04]
[5]覃海涛,王爱民.管道补焊强度有限元分析[J].焊管,2009,32(7):22.[doi:1001-3938(2009)07-0022-04]
QIN Hai-tao,WANG Ai-min.Finite Element Analysis of Repair Welding Strength in Oil Pipeline[J].,2009,32(11):22.[doi:1001-3938(2009)07-0022-04]
[6]薛振奎,隋永莉.焊接新技术在我国管道建设中的应用[J].焊管,2010,33(4):58.[doi:1001-3938(2010)04-0058-04]
XUE Zhen-kui,SUI Yong-li.The Application of the New Welding Technology in Our Country Pipeline Construction[J].,2010,33(11):58.[doi:1001-3938(2010)04-0058-04]
[7]吉建立,许 勇,黄 龙,等.国内外油气管道防腐层阴极剥离试验方法及标准对比[J].焊管,2013,36(10):68.[doi:1001-3938(2013)10-0068-05]
JI Jianli,XU Yong,HUANG Long,et al.Comparison of Cathodic Disbondment(CD) Test Methods andCriteria Between Overseas and China Oil and Gas Pipeline[J].,2013,36(11):68.[doi:1001-3938(2013)10-0068-05]
[8]隋永莉,曹晓军,胡小坡.油气管道环焊缝焊接施工应关注的问题及建议[J].焊管,2014,37(5):62.[doi:1001-3938(2014)05-0062-04]
SUI Yongli,CAO Xiaojun,HU Xiaopo.Focus on Problems and Suggestions of Oil and Gas Pipeline Circumferential Weld Welding at Site Construction[J].,2014,37(11):62.[doi:1001-3938(2014)05-0062-04]
[9]王国丽,庞艳风,谭建辉,等.油气管道全尺寸气体爆破试验场方案探讨[J].焊管,2015,38(4):33.[doi:1001-3938(2015)04-0033-05]
WANG Guoli,PANG Yanfeng,TAN Jianhui,et al.Discussion on Full-size Gas Burst Test Field Used for Oil and Gas Pipeline[J].,2015,38(11):33.[doi:1001-3938(2015)04-0033-05]
[10]孙巧飞,姚登樽,范玉然,等.西气东输三线0.8设计系数试验段水压试验测试[J].焊管,2015,38(9):51.[doi:1001-3938(2015)09-0051-05]
SUN Qiaofei,YAO Dengzun,FAN Yuran,et al.Hydrostatic Test of the Test Pipe Section with a 0.8 Design Factor in the Third West-to-East Gas Pipeline Project[J].,2015,38(11):51.[doi:1001-3938(2015)09-0051-05]