[1]薛天铸,李 军,孟丽芳.长距离铁精矿输送管道系统的运行调试[J].焊管,2014,37(6):44-47.[doi:1001-3938(2014)06-0044-04]
 XUE Tianzhu,LI Jun,MENG Lifang.Commissioning and Debugging of Pipeline System for Long DistanceTransporting Iron Ore Concentrate[J].,2014,37(6):44-47.[doi:1001-3938(2014)06-0044-04]
点击复制

长距离铁精矿输送管道系统的运行调试
分享到:

《焊管》[ISSN:1001-3938/CN:61-1160/TE]

卷:
37
期数:
2014年第6期
页码:
44-47
栏目:
工艺与设备
出版日期:
2014-06-28

文章信息/Info

Title:
Commissioning and Debugging of Pipeline System for Long Distance
Transporting Iron Ore Concentrate
文章编号:
1001-3938(2014)06-0044-04
作者:
薛天铸1李 军2孟丽芳2
(1. 美国管道系统工程(包头)有限公司,北京100125;
2. 包头钢铁(集团)有限公司给水厂,内蒙古 包头014010)
Author(s):
XUE Tianzhu1 LI Jun2 MENG Lifang2
(1. Pipeline Systems Incorporated (Baotou), Beijing 100125, China;
2. Baogang Group Water Plant, Baotou 014010, Neimenggu, China)
关键词:
焊管管道输送铁精矿极寒冷区域
Keywords:
welded pipepipe transportationiron ore concentrateextreme cold weather
分类号:
TE973.99
DOI:
1001-3938(2014)06-0044-04
文献标志码:
B
摘要:
通过在冬季对包钢白云西矿铁精矿管道输送系统进行试车和调试,确定了管道系统的各种参数和运行范围,并成功进行了检测环管测试和满管道带浆停车8 h再启动的性能测试,测试结果完全符合设计参数的要求,验证了包钢白云西矿在极寒冷区域条件下采用HFW管道输送铁精矿是可行的。生产实践证明,包钢白云西矿铁精矿管道输送系统已经成功试生产,并且获得了该管道在极寒条件中的运行经验。
Abstract:
The commissioning and debugging to pipeline system of Baogang Baiyun iron ore concentrate were conducted in winter, the various parameters and operating range were determined, and successfully carried out loop test and performance test, i.e. restart pipeline after 8 hour shutdown with slurry. The test results completely conformed to the requirements of design parameters, which verified using HFW pipeline to convery iron ore concentrate is feasible. The production practice proved that Baogang Baiyun iron ore concentrate has been successfully produced, and obtained the operation experience under extreme cold climate.

参考文献/References:

[1] 车跃光. 尖山长距离铁精矿管线的设计和建设[J]. 矿冶工程,2005,25(12):42-45.
[2] GANDHI R L, NORWOOD W J, CHE Y.铝土矿矿浆越野长距离管道输送实践[C].TMS, 2006.
[3] CHE Y ,GANDHI R L. Long Distance Slurry Pipeline and Its Application in China[C]//China Mine Engineering & Technology International Forum, Beijing, China: [s.n.], 2006.
[4] AUDE T C, PITTS J D. Slurry Pipeline Design-material and Equipment Selection[C]//International Technical Conference on Slurry Transportation.Columbus, Ohio:[s.n.], 1976.
[5] CHE Y, JENNINGS M, GUANG L C, et al. The Jian Shan Pipeline The First Long Distance Iron Concentrate Pipe-
line in China[C]//IRON ORE 2000. Chicago Illinois:  [s.n.],2000.
[6] DERAMMELAERE R H, CHAPMAN  J P. Slack Flow in the World’s Largest Iron Concentrate Slurry Pipeline[C]// Proc of the 4th International Conference on Slurry Transportation.Las Vegas: [s.n.], 1979.
[7] DOWD T J. La Perla/Hercules Iron Concentrate Pipeline Operations and Status Report and Escondida Copper Concentrate Pipeline Start-up and Operations Report[C]//16th International Conference on Coal and Slurry Tech-
nology. Washington: Coal and Slurry Transport Association,
      1991.
[8] GANDHI R L. The Samarco Iron Concentrate Pipeline-update on System Operation[C]// 16th International Con-
ference on Coal and Slurry Technology, Clear Water. Florida. Washington: Slurry Transport Association, 1991.
[9] GANDHI R L, SNOEK P E, CAMEY  J C. An Evaluation of Slurry Pumps[C]//Proc of the 5th International Conference on Slurry Transportation, Lake Tahoe: [s.n.],1980: 26-28.
[10] McDERMOTT W F, DAVIS R A, COWPER N T, et al.The World’s First Long Distance Iron Ore Slurry Pipeline [J]. Soc of Mining Engg, 1969(01): 84-90.

相似文献/References:

[1]马海君.强力焊管的孔型设计[J].焊管,2007,30(4):56.[doi:1001-3938(2007)04-0056-02]
 MA Hai-jun.Pass Design of High-strength Welded Pipe[J].,2007,30(6):56.[doi:1001-3938(2007)04-0056-02]
[2]刘庆才,李 东,黎剑锋.影响输气管线钢管抗H2S性能主要因素的探讨[J].焊管,2007,30(5):54.[doi:1001-3938(2007)05-0054-05]
 LIU Qing-cai,LI Dong,LI Jian-feng.Key Factors Affecting Sour Service Ability of Welded Pipe and Its Domestic Production[J].,2007,30(6):54.[doi:1001-3938(2007)05-0054-05]
[3]彭在美.我国焊接钢管的发展进入重要的战略转折期[J].焊管,2008,31(6):5.[doi:1001-3938(2008)06-0005-10]
 PENG Zai-mei.The Development of China Welded Pipe Steps into the Important Strategic Transition Period[J].,2008,31(6):5.[doi:1001-3938(2008)06-0005-10]
[4]李霄,熊庆人,石凯,等.焊管残余应力研究进展及展望[J].焊管,2009,32(7):12.[doi:1001-3938(2009)07-0012-06]
 LI Xiao,XIONG Qing-ren,SHI Kai,et al.Research Progress and Prospect of Residual Stress in Welded Pipe[J].,2009,32(6):12.[doi:1001-3938(2009)07-0012-06]
[5]马 露 涛.φ720mm焊管平头机夹管装置设计[J].焊管,2009,32(9):47.[doi:1001-3938(2009)09-0047-03]
 MA Lu-tao.Design for φ720mm Welded Pipe Beveling Machine Clamp Pipe Device[J].,2009,32(6):47.[doi:1001-3938(2009)09-0047-03]
[6]耿开博.铝管、不锈钢管的高频感应焊接[J].焊管,2009,32(11):29.[doi:1001-3938(2009)11-0029-03]
 GENG Kai-bo.High-frequency Induction Welding of Aluminum and Stainless Steel Pipes[J].,2009,32(6):29.[doi:1001-3938(2009)11-0029-03]
[7]陈志翔,Jean Paul Boillot,Jeff Noruk.数字激光视觉技术在焊管生产中的应用[J].焊管,2010,33(2):29.[doi:1001-3938(2010)02-0029-04]
 CHEN Zhi-xiang,Jean Paul Boillot,Jeff Noruk.Application of Digital Laser Vision Technology in Welded Pipe Production[J].,2010,33(6):29.[doi:1001-3938(2010)02-0029-04]
[8]黄克坚,苏章卓,甘遂谋,等.焊管机械扩径力的计算[J].焊管,2010,33(12):13.[doi:1001-3938(2010)12-0023-04]
[9]吴庆根.高频焊管生产中管体温度不均造成弯管的防止措施[J].焊管,2011,34(1):51.[doi:1001-3938(2011)01-0051-03]
[10]王晓香.坚持结构调整和科技进步继续向焊管强国迈进[J].焊管,2011,34(2):5.[doi:1001-3938(2011)02-0005-05]
 WANG Xiao-xiang.Go Ahead to the Target of Welded Pipe Powerful Nation by Insisting in Structural Adjustment and Technical Promotion[J].,2011,34(6):5.[doi:1001-3938(2011)02-0005-05]

备注/Memo

备注/Memo:
收稿日期:2013-11-13
作者简介:薛天铸(1970—),高级工程师,美国管道系统工程(包头)有限公司技术开发部经理,包钢白云铁精矿管道系统试车经理。
更新日期/Last Update: