相似文献/References:
[1]Satoshi IGI 伊木.中国西气东输二线管道延性断裂分析(一)[J].焊管,2008,31(2):23.[doi:1001-3938(2008)02-0023-04]
Satoshi IGI.Analysis on Ductile Fracture of the Second West to East Gas Pipeline Project[J].,2008,31(10):23.[doi:1001-3938(2008)02-0023-04]
[2]村田正彦.日本新日铁X80级管线钢管研究概述[J].焊管,2008,31(2):40.[doi:1001-3938(2008)02-0040-04]
Masahiko Murata.Pipe Study Summarization with Grade X80 Pipeline Steel by Nippon Co.Japan[J].,2008,31(10):40.[doi:1001-3938(2008)02-0040-04]
[3]Satoshi IGI 伊木.中国西气东输二线管道延性断裂分析(二)[J].焊管,2008,31(3):33.[doi:1001-3938(2008)03-0033-06]
Satoshi IGI.Analysis on Ductile Fracture of the Second West to East Gas Pipeline Project[J].,2008,31(10):33.[doi:1001-3938(2008)03-0033-06]
[4]蔡彬,郑福恩,李记科,等.海底油气管道延性断裂止裂CVN冲击功的计算[J].焊管,2011,34(12):39.[doi:1001-3938(2011)12-0039-04]
CAI Bin,LI Ji-ke,LI Yun-long.CVN Impact Values Calculation for the Arrest of Ductile Fracture for Subsea Oil and Gas Pipeline[J].,2011,34(10):39.[doi:1001-3938(2011)12-0039-04]
[5]马秋荣,等.X100管线钢管的技术要求及研究开发[J].焊管,2016,39(12):4.[doi:10.19291/j.cnki.1001-3938.2016.12.002]
MA Qiurong,ZHANG Duihong,et al.Development and Technical Requirements of Grade X100 Line Pipe[J].,2016,39(10):4.[doi:10.19291/j.cnki.1001-3938.2016.12.002]
[6]池 强,杨 坤,李 鹤,等.高钢级管道全尺寸气体爆破试验技术研究[J].焊管,2019,42(7):78.[doi:10.19291/j.cnki.1001-3938.2019.7.009]
CHI Qiang,YANG Kun,LI He,et al.Research on Full-scale Gas Blasting Test Technology for High-grade Pipeline[J].,2019,42(10):78.[doi:10.19291/j.cnki.1001-3938.2019.7.009]
[7]欧阳欣,李鹤,闫锋,等.输送工艺参数对密相/超临界CO2管道止裂韧性的影响[J].焊管,2023,46(6):1.[doi:10.19291/j.cnki.1001-3938.2023.06.001]
OUYANG Xin,LI He,YAN Feng,et al.Influence of Transmission Process Parameters on Crack Arresting Toughness of Dense Phase/Supercritical CO2 Pipeline[J].,2023,46(10):1.[doi:10.19291/j.cnki.1001-3938.2023.06.001]
[8]刘 冬,李荣锋,邱保文,等.高韧性管线钢止裂韧性参数CTOA测试方法研究进展[J].焊管,2013,36(10):51.[doi:1001-3938(2013)10-0051-05]
LIU Dong,LI Rongfeng,QIU Baowen,et al.Research Progress of CTOA Test Method in Toughness Arrest of High Toughness Pipeline Steel[J].,2013,36(10):51.[doi:1001-3938(2013)10-0051-05]