相似文献/References:
[1]许晓锋,李为卫,徐婷.通用焊接检验尺测量埋弧焊管焊缝余高的修正[J].焊管,2009,32(7):54.[doi:1001-3938(2009)07-0054-04]
XU Xiao-feng,LI Wei-wei,XU Ting.Amendment to the Weld Reinforcement Measurement of SAW Pipe with General Welding Measurement Ruler[J].,2009,32(10):54.[doi:1001-3938(2009)07-0054-04]
[2]张晓强.埋弧焊管弯曲试验开裂原因分析[J].焊管,2010,33(6):58.[doi:1001-3938(2010)06-0058-02]
ZHANG Xiao-qiang.Cracking Reason Analysis on SAWH Pipe Bend Test[J].,2010,33(10):58.[doi:1001-3938(2010)06-0058-02]
[3]韩新利,李为卫,马小芳,等.国外直缝埋弧焊管先进制造及质量检测技术[J].焊管,2010,33(9):29.[doi:1001-3938(2010)09-0029-05]
HAN Xin-li,LI Wei-wei,MA Xiao-fang,et al.Advanced Technologies of Manufacture and Inspection for Overseas SAWL Linepipe[J].,2010,33(10):29.[doi:1001-3938(2010)09-0029-05]
[4]桂光正.焊缝形貌对埋弧焊缝自动超声波探伤结果的影响分析[J].焊管,2011,34(6):54.[doi:1001-3938(2011)06-0054-04]
GUI Guang-zheng.Analysis on weld seam appearance affect Submerged arc weld seam automatic ultrasonic testing result[J].,2011,34(10):54.[doi:1001-3938(2011)06-0054-04]
[5]王 晨,任国庆.埋弧焊管超声波探伤标准反射体的选择[J].焊管,2011,34(11):58.[doi:1001-3938(2011)11-0058-04]
WANG Chen,REN Guo-qing.Standard Reflector Selection of Submerged Arc Welded Pipe Ultrasonic Testing (UT)[J].,2011,34(10):58.[doi:1001-3938(2011)11-0058-04]
[6]黄卫锋,钱伟方,王治国.UOE焊管埋弧焊焊接过程变形仿真研究[J].焊管,2011,34(12):12.[doi:1001-3938(2011)12-0012-05]
HUANG Wei-feng,QIAN Wei-fang,WANG Zhi-guo.Simulation Research on UOE Pipe Deformation During Submerged-arc Welding[J].,2011,34(10):12.[doi:1001-3938(2011)12-0012-05]
[7]张 君,牛 辉.X100管线钢冷裂纹敏感性研究[J].焊管,2011,34(12):22.[doi:1001-3938(2011)12-0022-05]
ZHANG Jun,NIU Hui.Study on Cold Cracking Sensitivity of X100 Grade Pipeline Steel[J].,2011,34(10):22.[doi:1001-3938(2011)12-0022-05]
[8]李云龙,吴金辉,张鸿博,等.埋弧焊管导向弯曲试验的探讨[J].焊管,2012,35(1):57.[doi:1001-3938(2012)01-0057-03]
LI Yun-long,WU Jin-hui,ZHANG Hong-bo,et al.Discussion on the Guide Bend Test for Submerged-arc Welded Pipe[J].,2012,35(10):57.[doi:1001-3938(2012)01-0057-03]
[9]甘正红,张 辉.直缝埋弧焊管焊缝横向裂纹的超声波检测[J].焊管,2012,35(5):54.[doi:1001-3938(2012)05-0054-04]
GAN Zheng-hong,ZHANG Hui.Ultrasonic Inspection of the Transverse Cracks in SAWL Pipe Weld[J].,2012,35(10):54.[doi:1001-3938(2012)05-0054-04]
[10]李为卫,王晓江.天然气输送钢管标准仍需考虑的几个技术问题[J].焊管,2012,35(12):57.[doi:001-3938(2012)12-0057-05]
LI Weiwei,WANG Xiaojiang.Several Technical Problems of Natural Gas Pipeline Steel Pipe’s Standard[J].,2012,35(10):57.[doi:001-3938(2012)12-0057-05]