相似文献/References:
[1]孔君华,郑 琳,关 云,等.西气东输二线工程用18.4 mm厚 X80级热轧板卷生产实践[J].焊管,2008,31(6):50.[doi:1001-3938(2008)06-0050-04]
KONG Jun-hua,ZHENG Ling,GUAN Yun,et al.Production Experience of X80 Grade Hot Rolled Coil with 18.4 mm Thickness Used〖JZ〗for the Second West to East Gas Pipeline Project[J].,2008,31(8):50.[doi:1001-3938(2008)06-0050-04]
[2]黄国建,张英慧,孔祥磊,等.特厚规格X70和X80级热轧卷板的开发与应用[J].焊管,2009,32(2):17.[doi:1001-3938(2009)02-0017-06]
HUANG Guo-jian,ZHANG Ying-hui,KONG Xiang-lei,et al.Development and Application of X70 & X80 Grade HRC with Heavy Thickness[J].,2009,32(8):17.[doi:1001-3938(2009)02-0017-06]
[3]郭孟齐,徐刚,王鑫,等.台车式弯管热处理炉设计[J].焊管,2009,32(9):41.[doi:1001-3938(2009)09-0041-03]
GUO Meng-qi,XU Gang,WANG Xin,et al.Design of Trolley Bend Pipe Heat Treatment Furnace[J].,2009,32(8):41.[doi:1001-3938(2009)09-0041-03]
[4]白雷杰,张海波.影响弯管环氧粉末防腐层质量与性能的因素及改进措施[J].焊管,2010,33(6):40.[doi:1001-3938(2010)06-0040-05]
BAI Lei-jie,ZHANG Hai-bo.Influence Factors and Improved Measures on FBE Coating Quality and Performance of Bend Pipe[J].,2010,33(8):40.[doi:1001-3938(2010)06-0040-05]
[5]郭宝利,徐 可.一种弯管特殊破口形式的加工方法[J].焊管,2011,34(7):66.
[6]孙 奇,赵 波 编译.高应变时效抗力X80管线钢显微组织和力学性能[J].焊管,2011,34(8):63.
[7]付彦宏,白雷杰,彭立山,等.X80级DN 1 200 mm大规格等径异径三通的研发[J].焊管,2011,34(9):30.
[8]赵志伟,徐 强,彭立山,等.X80感应加热弯管回火工艺研究[J].焊管,2012,35(1):44.[doi:1001-3938-(2012)01-0044-04]
ZHAO Zhi-wei,XU Qiang,PENG Li-shan,et al.Study on Tempering Process of X80 Induction Heating Bend[J].,2012,35(8):44.[doi:1001-3938-(2012)01-0044-04]
[9]赵志伟,高振宇,付彦宏,等.西气东输二线工程用X80级φ1 219 mm感应加热弯管的研发[J].焊管,2012,35(2):5.[doi:1001-3938(2012)02-0005-05]
ZHAO Zhi-wei,GAO Zhen-yu,FU Yan-hong,et al.The Development of X80 Grade φ1 219 mm Hot Induction Bend Used to the 2nd West-east Gas Pipeline Project[J].,2012,35(8):5.[doi:1001-3938(2012)02-0005-05]
[10]韩秀林,杨玮玮,赵 波,等.K60弯管的研制与分析[J].焊管,2012,35(6):47.[doi:1001-3938(2012)06-0047-04]
HAN Xiu-lin,YANG Wei-wei,ZHAO Bo,et al.Development and Analysis of K60 Bend Pipe[J].,2012,35(8):47.[doi:1001-3938(2012)06-0047-04]
[11]乔桂英,王 旭,付彦宏,等.加热温度和冷却速度对X80级弯管用钢组织与性能的影响[J].焊管,2008,31(6):15.[doi:1001-3938(2008)06-0015-04]
QIAO Gui-ying,WANG Xu,FU Yan-hong,et al.Effects of Heat Temperature and Cooling Rate on Microstructure and Mechanical Properties of X80 Steel[J].,2008,31(8):15.[doi:1001-3938(2008)06-0015-04]
[12]刘迎来,许 彦,王高峰,等.中俄东线-45 ℃低温环境油气管道工程用X80钢级Φ1 422 mm×33.8 mm感应加热弯管研发[J].焊管,2019,42(7):48.[doi:10.19291/j.cnki.1001-3938.2019.7.005]
LIU Yinglai,XU Yan,WANG Gaofeng,et al.Development of X80 Φ1 422 mm×33.8 mm Induction Heating Bend for China-RussiaEast Nature Gas Pipeline Project in -45 ℃ Low Temperature Environment[J].,2019,42(8):48.[doi:10.19291/j.cnki.1001-3938.2019.7.005]