相似文献/References:
[1]申昭熙,丁学光,李东风,等.ERW套管与无缝套管残余应力及外压挤毁试验研究[J].焊管,2007,30(4):31.[doi:1001-3938(2007)04-0031-02]
SHEN Zhao-xi,DING Xue-guang,LI Dong-feng,et al.Study of Residual Stress and Collapse of ERW and Seamless Casing[J].,2007,30(6):31.[doi:1001-3938(2007)04-0031-02]
[2]李 东,刘庆才.直缝焊管预焊缺陷对埋弧焊质量的影响及控制[J].焊管,2007,30(4):79.[doi:1001-3938(2007)04-0079-04]
LI Dong,LIU Qing-cai.Affects and Control to Welding Quality of Tack Welding Defect for LSAW Pipe[J].,2007,30(6):79.[doi:1001-3938(2007)04-0079-04]
[3]马建军,黄运明,高建忠,等.大直径厚壁直缝埋弧焊管质量影响因素及控制方法[J].焊管,2007,30(5):19.[doi:1001-3938(2007)05-0019-04]
MA Jian-jun,HUANG Yun-ming,GAO Jian-zhong,et al.Influence Factors and Control Methods for the Quality of LSAW Line Pipes with Large Diameter and Big Wall Thickness[J].,2007,30(6):19.[doi:1001-3938(2007)05-0019-04]
[4]宫少涛,王爱民,吉玲康,等.X80与X100级管线钢屈服强度Rt 0.5与Rp 0.2的差异性研究[J].焊管,2007,30(5):42.[doi:1001-3938(2007)05-0042-03]
GONG Shao-tao,WANG Ai-min,JI Ling-kang,et al.Study on Difference Between Yield Strength Rt 0.5 and Rp 0.2 for X80 and X100 Pipelines Steel[J].,2007,30(6):42.[doi:1001-3938(2007)05-0042-03]
[5]赵春友.中直径直缝双面埋弧焊钢管[J].焊管,2007,30(5):59.[doi:1001-3938(2007)05-0059-02]
ZHAO Chun-you.Longitudinal Double Submerged Arc Welded Pipe with Medium Diameter[J].,2007,30(6):59.[doi:1001-3938(2007)05-0059-02]
[6]王亚利.钢板预弯边机油缸改型设计[J].焊管,2008,31(1):61.[doi:1001-3938(2008)01-0061-03]
WANG Ya-li.Modification Design on Hydro Cylinder of Steel Plate Pre-bending Machine[J].,2008,31(6):61.[doi:1001-3938(2008)01-0061-03]
[7]宋立新,王 勇,韩 涛,等.管道在役焊接接头残余应力的研究[J].焊管,2008,31(2):31.[doi:1001-3938(2008)02-0031-04]
SONG Li-xin,WANG Yong,HAN Tao,et al.Study on Residual Stress of In-service Welding onto Pipeline Steel[J].,2008,31(6):31.[doi:1001-3938(2008)02-0031-04]
[8]李志华,张 涵,王胜利,等.薄壁直缝埋弧焊管焊缝结晶裂纹分析与控制[J].焊管,2008,31(3):71.[doi:1001-3938(2008)03-0071-02]
LI Zhi-hua,ZHANG Han,WANG Sheng-li,et al.Analysis and Control of Crystal Crack in LSAW Small Wall-thickness Pipes[J].,2008,31(6):71.[doi:1001-3938(2008)03-0071-02]
[9]杨天冰,郭瑞杰,白世武,等.X70级管道环焊缝接头残余应力数值模拟[J].焊管,2008,31(4):21.[doi:1001-3938(2008)04-0021-07]
YANG Tian-bing,GUO Rui-jie,BAI Shi-wu,et al.Residual Stress Simulation of X70 Pipeline Girth Welding Joint[J].,2008,31(6):21.[doi:1001-3938(2008)04-0021-07]
[10]郭振其,李志华.热轧卷板开平板在直缝埋弧焊管中的应用[J].焊管,2008,31(4):51.[doi:1001-3938(2008)04-0051-03]
GUO Zhen-qi,LI Zhi-hua.Plate from Opening and Leveling HRC Applied in Longitudinal Submerged Arc Welded Pipe[J].,2008,31(6):51.[doi:1001-3938(2008)04-0051-03]
[11]张 涵,姚舜鹏,刘克永.基于ANSYS的直缝埋弧焊管焊接过程数值模拟[J].焊管,2008,31(6):35.[doi:1001-3938(2008)06-0035-04]
ZHANG Han,YAO Shun peng,LIU Ke-yong.Numerical Simulation of Longitudinal Submerged Arc Welded Pipe During Welding Course Basic on ANSYS[J].,2008,31(6):35.[doi:1001-3938(2008)06-0035-04]
[12]郑家胜,于 磊,彭 静,等.去应力退火对X80焊管残余应力影响分析[J].焊管,2019,42(1):24.[doi:10.19291/j.cnki.1001-3938.2019.1.004]
ZHENG Jiasheng,YU Lei,PENG Jing,et al.Effect of Stress Relief Annealing on Residual Stress of X80 Welded Pipe[J].,2019,42(6):24.[doi:10.19291/j.cnki.1001-3938.2019.1.004]