相似文献/References:
[1]胡德虎,赵 炜,牛 辉,等.螺旋埋弧焊管双丝高速焊工艺参数的优化[J].焊管,2007,30(4):69.[doi:1001-3938(2007)04-0069-03]
HU De-hu,ZHAO Wei,NIU Hui,et al.Process Parameters Optimization of High Speed Welding with Double Wires for Spiral Submerged Arc Welded Pipe[J].,2007,30(2):69.[doi:1001-3938(2007)04-0069-03]
[2]杨 志 孝.一种简单实用的螺旋埋弧焊管内焊清渣机[J].焊管,2007,30(5):63.[doi:1001-3938(2007)05-0063-03]
YANG Zhi-xiao.New & Practical Welding Slag Cleaning Unit for Inside Welding of Helical Submerged Arc Welding Pipe[J].,2007,30(2):63.[doi:1001-3938(2007)05-0063-03]
[3]李必文,杨春雨,王树人,等.带钢边缘加工工艺的改进——双铣边替代剪边[J].焊管,2008,31(2):63.[doi:1001-3938(2008)02-0063-04]
LI Bi-wen,YANG Chun-yu,WANG Shu-ren,et al.Improvement of Machining Process for Strip Edges-replacing Edges Cutting with Double Milling[J].,2008,31(2):63.[doi:1001-3938(2008)02-0063-04]
[4]秦跃平.前摆式螺旋埋弧焊管机组内焊缝裂纹产生原因分析[J].焊管,2008,31(4):62.[doi:1001-3938(2008)04-0062-02]
QIN Yue-ping.Analysis on Reason of Inside Weld Crack of Front Swing SSAW Pipe Units[J].,2008,31(2):62.[doi:1001-3938(2008)04-0062-02]
[5]林春明,徐泽旋,朱文闯,等.螺旋埋弧焊管焊缝中链状气孔的判定[J].焊管,2008,31(4):69.[doi:1001-3938(2008)04-0069-03]
LIN Chun-ming,XU Ze-xuan,ZHU Wen-chuang,et al.Verification to Chain Porosity in Weld of SSAW Pipe[J].,2008,31(2):69.[doi:1001-3938(2008)04-0069-03]
[6]李为卫,王亚龙,李 洋,等.小批量试制X80级板卷及焊管的拉伸性能分析[J].焊管,2008,31(5):16.[doi:1001-3938(2008)05-0016-04]
LI Wei-wei,WANG Ya-long,LI Yang,et al.Analysis on Tensile Properties of Small Batch Trial-produced X80 Grade Steel Coil and Welded Pipe[J].,2008,31(2):16.[doi:1001-3938(2008)05-0016-04]
[7]郭宏侠,尹长华.中厚度钢板单面焊全熔透焊缝焊接技术[J].焊管,2008,31(6):69.[doi:1001-3938(2008)06-0069-03]
GUO Hong-xia,YIN Chang-hua.Welding Technology of One Side Full Penetration Welding for Heavy Plate[J].,2008,31(2):69.[doi:1001-3938(2008)06-0069-03]
[8]张心保,岳维恒.装饰用430不锈钢矩形薄壁焊管制造工艺[J].焊管,2009,32(5):42.[doi:1001-3938(2009)05-0042-03]
ZHANG Xin-bao,YUE Wei-heng.Manufacture process of ornamental rectangular thin wall welded tube made of 430 stainless steel[J].,2009,32(2):42.[doi:1001-3938(2009)05-0042-03]
[9]陈小康,张毅.螺旋埋弧焊管生产过程卷板消耗定额编制方法及应用[J].焊管,2009,32(5):70.[doi:1001-3938(2009)05-0070-03]
CHEN Xiao-kang,ZHANG Yi.Formulate Steel Coil Consumption Quota Method During SSAW Pipe Production and Its Application[J].,2009,32(2):70.[doi:1001-3938(2009)05-0070-03]
[10]孟德强,宁月,徐辉.螺旋埋弧焊管常见焊接裂纹的分析[J].焊管,2009,32(7):58.[doi:1001-3938(2009)07-0058-04]
MENG De-qiang,NING Yue,XU Hui.Analysis on Common Welding Crack of SSAW Pipe[J].,2009,32(2):58.[doi:1001-3938(2009)07-0058-04]
[11]宗 波,王树人,王铁民,等.国产X80级螺旋埋弧焊管的试制[J].焊管,2008,31(6):39.[doi:1001-3938(2008)06-0039〖KG-*2〗-04]
ZONG Bo,WANG Shu-ren,WANG Tie-min,et al.Trial Production of X80 Grade Helically Submerged Arc Welded Pipe in China[J].,2008,31(2):39.[doi:1001-3938(2008)06-0039〖KG-*2〗-04]
[12]刘德应,易建军,严绍书,等.X100大直径螺旋埋弧焊管的试制[J].焊管,2012,35(3):60.[doi:1001-3938(2012)03-0060-06]
LIU De-ying,YI Jian-jun,YAN Shao-shu,et al.Trial-production of X100 Large Diameter SAW Pipe[J].,2012,35(2):60.[doi:1001-3938(2012)03-0060-06]