参考文献/References:
[1] API SPEC 5L, Specification for Line Pipe(44th edition)[S].
[2] ZAJAC S, SCHWINN V, TACKE K H. Characterisation and Quantification of Complex Bainitic Microstructures in High and Ultra-high Strength Linepipe Steels[J].Material Science Forum,2005,500-501:387-394.
[3] SUIKKANEN P, KARJALAINEN L, DEARDO A. Effect of Carbon Content on the Phase Transformation Characteristics, Microstructure and Properties of 500 MPa Grade Microalloyed Steels with Non-polygonal Ferrite Microstructures[J].La Metallurgia Italiana, 2008(05): 41-54. [4] REGIER R W, SPEER J G., MATLOCK D K, et al. Effect of Cooling Rate on the Crystallographic Effective Grain Size of Ferrite in Low-carbon Microalloyed Steels[C]∥Association for Iron and Steel Technology International Symposium on the Recent Developments in Plate Steels, Winter Park: [s.n.],2011: 351-363.
[5] KOSTRYZHEV A G, STRANGWOOD M, DAVIS C L. Bauschinger Effect in Microalloyed Steels: Part II. Influence of Work Softening on Strength Development during UOE Line-pipe Forming[J].Metallurgical and Materials Transactions A, 2011,42(10):3170-3177.
[6] SCHWINN V, FLUESS P, LIESSEM A, et al. Concepts of Grade X100 for High Toughness and Strain Based Design Application[C]∥Proceedings of the Eighteenth(2008)International Offshore and Polar Engineering Conference, Vancouver,Canada:[s.n.],2009:6-11.
[7] BIAN Y, PENNISTON C, COLLINS L, et al. Evaluation
of UOE and Spiral-welding Line Pipe for Strain-based Designs[C]∥Proceedings of the 8th International Pipeline Conference,Calgary: [s.n.],2010:139-148.
[8] DOUG STALHEIM. Metallurgical Optimization of Microalloyed Steels for Oil and Gas Transmission Pipelines[C]∥Proceedings and Presentation at the 6th International Conference on High Strength Low Alloy Steels(HSLA Steels 2011).Beijing: [s.n.],2011.
[9] API RP 5L3―1996, Recommended Practice for Conducting Drop-weight Tear Tests on Line Pipe 3rd Edition[S].
[10]KOSTRYZHEV A G,STRANGWOOD M,DAVIS C L. Bauschinger Effect in Microalloyed Steels:Part I.Depen-
dence on Dislocation-particle Interaction[J].Metallurgical and Materials Transactions A,2010,41(6):1399-1408.
相似文献/References:
[1]马海君.强力焊管的孔型设计[J].焊管,2007,30(4):56.[doi:1001-3938(2007)04-0056-02]
MA Hai-jun.Pass Design of High-strength Welded Pipe[J].,2007,30(2):56.[doi:1001-3938(2007)04-0056-02]
[2]刘庆才,李 东,黎剑锋.影响输气管线钢管抗H2S性能主要因素的探讨[J].焊管,2007,30(5):54.[doi:1001-3938(2007)05-0054-05]
LIU Qing-cai,LI Dong,LI Jian-feng.Key Factors Affecting Sour Service Ability of Welded Pipe and Its Domestic Production[J].,2007,30(2):54.[doi:1001-3938(2007)05-0054-05]
[3]彭在美.我国焊接钢管的发展进入重要的战略转折期[J].焊管,2008,31(6):5.[doi:1001-3938(2008)06-0005-10]
PENG Zai-mei.The Development of China Welded Pipe Steps into the Important Strategic Transition Period[J].,2008,31(2):5.[doi:1001-3938(2008)06-0005-10]
[4]李霄,熊庆人,石凯,等.焊管残余应力研究进展及展望[J].焊管,2009,32(7):12.[doi:1001-3938(2009)07-0012-06]
LI Xiao,XIONG Qing-ren,SHI Kai,et al.Research Progress and Prospect of Residual Stress in Welded Pipe[J].,2009,32(2):12.[doi:1001-3938(2009)07-0012-06]
[5]马 露 涛.φ720mm焊管平头机夹管装置设计[J].焊管,2009,32(9):47.[doi:1001-3938(2009)09-0047-03]
MA Lu-tao.Design for φ720mm Welded Pipe Beveling Machine Clamp Pipe Device[J].,2009,32(2):47.[doi:1001-3938(2009)09-0047-03]
[6]耿开博.铝管、不锈钢管的高频感应焊接[J].焊管,2009,32(11):29.[doi:1001-3938(2009)11-0029-03]
GENG Kai-bo.High-frequency Induction Welding of Aluminum and Stainless Steel Pipes[J].,2009,32(2):29.[doi:1001-3938(2009)11-0029-03]
[7]陈志翔,Jean Paul Boillot,Jeff Noruk.数字激光视觉技术在焊管生产中的应用[J].焊管,2010,33(2):29.[doi:1001-3938(2010)02-0029-04]
CHEN Zhi-xiang,Jean Paul Boillot,Jeff Noruk.Application of Digital Laser Vision Technology in Welded Pipe Production[J].,2010,33(2):29.[doi:1001-3938(2010)02-0029-04]
[8]李珂,王自信,丁成飞.X80螺旋埋弧焊管管体强度影响因素分析[J].焊管,2010,33(4):22.[doi:1001-3938(2010)04-0022-04]
LI Ke,WANG Zi-xin,DING Cheng-fei.Effect Factor Analysis on X80 SAWH Pipe Body Strength[J].,2010,33(2):22.[doi:1001-3938(2010)04-0022-04]
[9]郑茂盛,李立科,赵 青,等.热处理工艺对X80管线钢耐腐蚀性能的影响[J].焊管,2010,33(11):12.[doi:1001-3938(2010)11-0012-06]
ZHENG Mao-sheng,LI Li-ke,ZHAO Qing,et al.Influence of Heat Treatment on Corrosive Resistance of X80 Pipeline Steel[J].,2010,33(2):12.[doi:1001-3938(2010)11-0012-06]
[10]黄克坚,苏章卓,甘遂谋,等.焊管机械扩径力的计算[J].焊管,2010,33(12):13.[doi:1001-3938(2010)12-0023-04]
[11]毕宗岳,牛爱军,牛 辉,等.国内外X80深水钻井隔水管主管性能对比[J].焊管,2013,36(11):5.[doi:1001-3938(2013)11-0005-05]
BI Zongyue,NIU Aijun,NIU Hui,et al.Performance Comparison of Main Pipeline of X80 Deepwater Drilling Riser in Domestic and Overseas[J].,2013,36(2):5.[doi:1001-3938(2013)11-0005-05]
[12]刘振伟,王志太,孙志刚,等.高温预回火对X80螺旋埋弧焊管性能的影响[J].焊管,2015,38(11):20.[doi:1001-3938(2015)11-0020-06]
LIU Zhenwei,WANG Zhitai,SUN Zhigang,et al.Influence of High-temperature Pre-tempering on X80 SAWH Pipe Performance[J].,2015,38(2):20.[doi:1001-3938(2015)11-0020-06]
[13]嵇 峰,张婷婷,吕成秀,等.X80钢级Φ1 219 mm×33 mm/37.9 mm热煨弯管研制[J].焊管,2019,42(1):17.[doi:10.19291/j.cnki.1001-3938.2019.1.003]
JI Feng,ZHANG Tingting,LYU Chengxiu,et al.Development of X80 Φ1 219 mm×33 mm/37.9 mm Hot Induction Bend Pipe[J].,2019,42(2):17.[doi:10.19291/j.cnki.1001-3938.2019.1.003]